Outdoor electrical panel with the cables running out towards the trench

Electric mobility

We install charging points for your company cars and your car park, to ITC-BT-52. First we see how much spare power you have. The points share it between them, so you do not need a bigger supply. And we legalise the whole thing.

What it covers

  • ITC-BT-52
  • Load management
  • Fleet and visitors
01How much power is spare

Before fitting a point we check how much power your board has to spare, and at what times. That tells us how many points fit.

02Dynamic load management

The points share out whatever power is available at any moment. So you do not have to upgrade your supply.

03For your fleet and for visitors

Company cars charge slowly overnight. Visitors get their own point, with its consumption metered separately.

04Legalisation

We carry out the installation and legalise it under ITC-BT-52, with its documentation and its installation certificate.

Standards for this service

The standards named here
  • ITC-BT-52

The full list, with the registrations and what each standard requires, is in Standards and registrations.

Standards and registrations →

Do you need this for one of your installations?Tell us what is installed

Recent projects

Tap a photo to see the job from the inside: what was asked, how it was done and what was installed.

See all projects