From 2023 to today

What we have done each year since we opened the workshop.

To date, 144 boarding bridges at 44 airports and ports in 28 countries.

  1. 2023

    We open the workshop in Montcada

    We started building electrical panels for factories and looking after their installations so they never stop.

    Industrial installations
    • Electrical panel being assembled in the workshop
      Panel under assembly, Montcada workshop
    • Panel with variable frequency drives in an industrial plant
      Drive panel, 2023
    • Open low-voltage main distribution board, with the measurement transformers in view
      Industry, 2023
    • Boarding bridge docked to an aircraft at Seville airport
      Airport, Spain, 2023
    • Copper busbar inside a power electrical panel
      Industry, 2023
    • Pre-conditioned air duct and cabling under a boarding bridge
      Airport, Spain, 2023
  2. 2024

    Seven bridges for Brussels

    We built seven boarding bridges in our workshop for Brussels Airport and got them running there.

    Boarding bridges
    • Terminal block and neat wiring inside a control panel
      Terminal strip of a control panel
    • Finished electrical panel enclosures in the workshop
      Workshop, 2024
  3. 2025

    United Kingdom, Switzerland and France

    We went abroad: new bridges at airports and ports in three countries.

    Our projects
    • Port passenger bridge at sunset, beside the quay
      Port bridge, 2025
    • Power connections of a motor with green cables and protections
      Power connection, 2025
    • Moulded-case circuit breaker and power cables inside a panel
      Panel
    • Inside a control panel with power supplies and terminal block
      Industry, 2025
  4. 2026

    This year

    We keep working for factories, shops and data rooms, and we have six projects under way.

    • Trench with power cables on a tray under an electrical panel
      Supply trench, 2026
    • Thermographic image of an electrical panel next to the real photo
      Maintenance, 2026
    • Open outdoor electrical panel above a trench with power cables
      Airport, 2026
    • Power cables on a metal tray under a platform
      Airport, 2026
A job for this year?