Industrial electrical installations

We wire your whole plant: the incoming supply, the lines, the boards, the lighting and the power outlets. All of it to the REBT, the Spanish low-voltage regulation. If the installation needs a design or an OCA inspection, we handle that too.

What it covers

  • REBT
  • Legalisation
  • OCA inspection
01We go over the quote with you

Before we start, we go through the quote and the site safety with you. That way problems come up in the meeting, while they are still cheap to fix.

02Diagrams and paperwork

If you do not have the installation diagrams, our technical office draws them. We also prepare the documentation for you.

03The board comes from our workshop

We build and test the board in our Montcada workshop. We prepare the material there too, so all that is left at your plant is fitting it.

04Always the same technician

You have one technician who knows your installation. On bigger jobs there is also a site foreman who talks to the technician directly.

05Installation and testing

On site we mark out where the conduit and cable trays go, install everything and test it with the technical office. The safety paperwork is always up to date.

Standards for this service

The standards named here
  • REBT

The full list, with the registrations and what each standard requires, is in Standards and registrations.

Standards and registrations →

Do you need this for one of your installations?Tell us what is installed